Question: 1 A solid waste recycling plant is considering two types of storage bins. On the basis of a 9 year study period present worth analysis;


1 A solid waste recycling plant is considering two types of storage bins. On the basis of a 9 year study period present worth analysis; assume Market Value equal to Book Value. At an interest rate of 10% per year. The Present Worth Standard Notation for Alternative Q, using a 9 year study period method, is: (10 Points) Storage Bin First Cost, BD Annual Operating Cost, BD Salvage value, BD P 18,000 2,800 1,000 3 35,000 3,600 3,000 10 Life, years Pw = -35,000 - 3,600 (P/A, 10%,9) + 5,000 (P/F,10%,9) Pw = -35,000 - 3,600 (P/A, 10%,9) + 3,000 (P/F, 10%,9) Pw = -35,000 - 3,600 (P/A, 10%,9) + 6,200 (P/F,10%,9) Pw = -35,000 - 3,600 (P/A, 10%,9) + 4,200 (P/F,10%,9) A solid waste recycling plant is considering two types of storage bins. On the basis of a 9 year study period present worth analysis; assume Market Value equal to Book Value. At an interest rate of 10% per year. The Present Worth Standard Notation for Alternative Q, using a 9 year study period method, is: (10 Points) Storage Bin First Cost, BD Annual Operating Cost, BD Salvage value, BD P 18,000 2,800 1,000 3 Q 35,000 3,600 3,000 10 Life, years
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts