Question: 1 Activities Activity Cost 2 Billing error correction $36,000.00 3 Cable signal testing 91,800.00 4 Reinstalling service (installed incorrectly the first time) 28,000.00 5 Repairing
| 1 | Activities | Activity Cost |
| 2 | Billing error correction | $36,000.00 |
| 3 | Cable signal testing | 91,800.00 |
| 4 | Reinstalling service (installed incorrectly the first time) | 28,000.00 |
| 5 | Repairing satellite equipment | 37,800.00 |
| 6 | Repairing underground cable connections to the customer | 17,000.00 |
| 7 | Replacing old technology cable with higher quality cable | 169,000.00 |
| 8 | Replacing old technology signal switches with higher quality switches | 126,000.00 |
| 9 | Responding to customer home repair requests | 27,000.00 |
| 10 | Training employees | 7,400.00 |
| 11 | Total | $540,000.00 |
d. Interpret the information in (b) and (c).
What percentage of total costs of quality are considered to be value-added? %


b. Prepare a cost of quality report. Assume that sales are $2,200, 000. Round percentages to one decimal place. Refer to the Amount Descriptions list provided for the exact wording of the answer choices for text entries. Score: 24/79 Three Rivers Inc. Cost of Quality Report Percent of Total Percent of Total Quality Cost Classification Quality Cost 1 Quality Cost Sales 2 Prevention 3 Appraisal 4 Internal failure 5 External failure Total c. Prepare a value-addedon-value-added analysis. Refer to the Amount Descriptions list provided for the exact wording of the answer choices for text entries. Score: 12/36 Three Rivers Inc. Value-Added/Non-Value-Added Activity Analysis Category Amount Percent 1 2 Value-added 3 Non-value-added Total 4
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
