Question: = 1. An engineer is trying to choose a team of five workers to work on a project. The team consists of seven workers who
1. An engineer is trying to choose a team of five workers to work on a project. The team consists of seven workers who have been rated (on a scale of 1= poor to 3= excellent) according to their ability to conduct the project tasks ( A,B, and C ). The tasks that each worker is allowed to execute and the worker's skills (D, E, F, and G) are listed in Table 1. Table 1: Data for Prohlem 1 The selected five-workers team must satisfy the following restrictions: a. At least 4 workers must be able to conduct task A, at least 2 workers must be able to conduct task B, and at least I worker must be able to conduct task C. b. The average level of each of the skills D, E, and F of the selected team must be at least 2. c. If worker 3 is included in the team, then worker 6 cannot be in the team. d. If worker 1 is selected, then workers 4 and 5 must both be selected. c. Either worker 2 or worker 3 must be in the team. Given these constraints, the engineer wants to maximize the total value of ability G of the selected team. Formulate an IP that will help him choose his team. Solve the problem using CPLEX. (Hint: a binary variable in CPLEX can be defined as follows: "dvar boolean 1;" )
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
