Question: 1 . Can both steps of the cooling process be modeled using Lumped Parameter / Lumped Capacitance? 2 . Which will take a longer time
Can both steps of the cooling process be modeled using Lumped ParameterLumped
Capacitance?
Which will take a longer time air cooling or water quenching? Justify your answer
based upon the Biot number. Explain in terms of physical phenomenon not simply
numerical reasoning. Determine the time of the process you selected.
Determine the total energy removed from the gold ingot.
If the conveyer belt is m in length specify the belt speed such that when an ingot
reaches the end of the belt it is at the desired temperature.
If you increase the belt speed what must be done to ensure the ingot reaches a tem
perature of oC at the end of the belt?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock