Question: 1. Compute the standard overhead rate. Hint. Standard allocation base at 80 capacity is ( 20,000 mathrm{DLH} ), computed as 10,000 units ( 2.00 mathrm{DL}




1. Compute the standard overhead rate. Hint. Standard allocation base at \80 capacity is \\( 20,000 \\mathrm{DLH} \\), computed as 10,000 units \\( 2.00 \\mathrm{DL} \\) per unit. 2. Compute the total overhead variance. 3. Compute the overhead controllable variance. 4. Compute the overhead volume variance. Complete this question by entering your answers in the tabs below. Compute the total overhead variance. Note: Indicate the effect of the variance by selecting favorable, unfavorable, on no variance. Do not round intermediate calculations. Complete this question by entering your answers in the tabs below. Compute the overhead controllable variance. Note: Indicate the effect of the variance by selecting favorable, unfavorable, or no variance. Do not round intermediate calculations. 1. Compute the standard overhead rate. Hint. Standard allocation base at \80 capacity is \\( 20,000 \\mathrm{DLH} \\). computed as 1 2.00 DLH per unit. 2. Compute the total overhead variance. 3. Compute the overhead controllable variance. 4. Compute the overhead volume variance. Complete this question by entering your answers in the tabs below. Compute the standard overhead rate. Hint: Standard allocation base at \80 capacity is \\( 20,000 \\mathrm{DLH} \\), computed as 10,000 units \\( \\times 2,00 \\) DLH per unit. Note: Round your answer to 2 decimal places. Exercise 21-19 (Algo) Overhead controllable and volume variances LO P4 Blaze Corporation allocates overhead on the basis of DLH and the standard amount per allocation base is 2.00 DLH per unit. For March, the company planned production of 10,000 units ( \80 of its production capacity of 12,500 units) and prepared the following budget. The company actually operated at \90 capacity \\( (11,250 \\) units) in March and incurred actual total overhead costs of \\( \\$ 111,165 \\). 1. Compute the standard overhead rate. Hint. Standard allocation base at \80 capacity is \\( 20,000 \\mathrm{DLH} \\), computed as 10,000 units * 2.00 DLH per unit. 2. Compute the total overhead variance. 3. Compute the overhead controllable variance. 4. Compute the overhead volume variance. Complete this question by entering your answers in the tabs below. Compute the standard overhead rate. Hint: Standard allocation base at \80 capacity is \\( 20,000 \\mathrm{DLH} \\), computed as 10,000 units \\( \\times 2.00 \\) DLH per unit. Note: Round your answer to 2 decimal places: 4. Compute the overhead controllable variance. Complete this question by entering your answers in the tabs below. Compute the overhead volume variance. Note: Indicate the effect of the variance by selecting favorable, unfavorable, or no variance. Do not round intermediate calculations
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
