Question: 1. Concrete is properly vibrated when Oa. Large air bubbles no longer appear at surface b. Vibrator changes pitch or tone O c. Large aggregate

 1. Concrete is properly vibrated when Oa. Large air bubbles no

1. Concrete is properly vibrated when Oa. Large air bubbles no longer appear at surface b. Vibrator changes pitch or tone O c. Large aggregate blends into surface O d. All of the above Question 2 (Mandatory) (1 point) Listen 2. Construction joints in floors must be located Oa. Within the middle third of spans Ob. Two times the width O c. Wherever possible Od. In accordance with ASTM standards Question 3 (Mandatory) (1 point) Listen 3. When pumping concrete, the maximum size aggregate for an 2" hose is _ O a. 5/8" Ob. 34" Oc. 1 Od. 1.25 Question 4 (Mandatory) (1 point) 1) Listen 4. The correct term to describe the act of depositing and consolidating concrete is Oa. Pouring Ob. Mixing O c. Placing O d. Introduce

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!