Question: 1) Consider a project with the cash flows shown below. Assume that the required return is 15%. Solve what is the Internal Rate of Return

1) Consider a project with the cash flows shown below. Assume that the required return is 15%. Solve what is the Internal Rate of Return and Net Present Value using Excel based on the following data.

-(Please Show The Solution From Excel)

Year

Cash Flow

0

-$95,000

1

24,530

2

22,070

3

50,423

4

42,750

5

-2,100

a) Based on the internal rate of return, would you accept or reject this project? Solve and explain.

b) Based on the net present value, would you accept or reject this project? Solve and explain.