Question: 1. Consider the following serial line: Machine 1 Machine 2 Machine 3 Process Time: Process Time: Process Time: 3 mins/part 3 mins/part 3 mins/part The

1. Consider the following serial line: Machine 1 Machine 2 Machine 3 Process Time: Process Time: Process Time: 3 mins/part 3 mins/part 3 mins/part The total number of parts to be produced is 300. Answer the following questions: Assuming a setup time of 0.5 min is required before each starting each batch, calculate the cycle time, lead time, and production rate if the batch sizes are 1, 20 and 50 parts. Make sure that you show your calculations in the table given below. Lead Time Batch Size Cycle Time 20 50