Question: 1 ) Define the word Manufacturing? ( 2 pts ) 2 ) True or False? Mentafacturing, or making for use, is the earliest form of

1) Define the word Manufacturing? (2pts)
2) True or False? Mentafacturing, or making for use, is the earliest form of manufacturing. (2pts)
3) What are the three components of the manufacturing system? (2pts)
4) The first step in transforming raw materials into products is _____ processing. (2pts)
A. resource
B. standard
C. usufacturing
D. primary
5) The _____ includes operation name, machine used, and tooling needed to produce a product. (2pts)
6) The _____ describes each task, codes each task, identifies machines to be used, and lists tooling for the task. (2pts
7) The _____ shows how each part is made and how they are assembled into a final product. (2pts)
8) True or False? Material handling is a term used to describe devices such as jigs, fixtures, patterns, and templates used to make workers faster, more accurate, safer. (2pts)
9)_____ layouts are used to design a factory around the production of one specific product. (2pts)
A. Process
B. Product
C. Tooling
D. Material
10) True or False? Process layouts group machines by the processes they perform. (2pts)
Product Design & Process (Operations Management).
11) Product design the process of defining all of the companys product characteristics and Product design must support product manufacturability (the ease with which a product can be made)(2pts)
True or False
12) Idea development: all products begin with an idea whether from: customers, competitors or person (suppliers).(2pts)
True or False
13) Idea Development - Someone thinks of a need and a product/service design to satisfy it: customers, marketing, engineering, competitors, benchmarking, reverse engineering and supplier.
True or False (2pts)
14) Preliminary Design and Testing - Technical specifications are developed, prototypes built, testing starts (2pts)
True or False
15) Final Design - Final design based on test results, facility, equipment, material, & labor skills defined, suppliers identified (2pts)
True or false
16) Process performance metrics defined: Measurement of different process characteristics that tell us how a process is performing (2pts)
True or False
17)(9 points)
Metrics Example: At Zelles Dry Cleaning, it takes an average of 2 hours to dry clean & press a shirt, with value-added time estimated at 100 min. Workers are paid for a 7-hour workday but work 5 hr/day, accounting for breaks and lunch. Zelles completes 20 shirts per day, while the industry standard is 25 for a comparable facility.
Process Velocity =(Throughput Time)/(Value-added time)
=(120 minutes/shirt)/(100 minutes/shirt)=1.20
Labor Utilization =(Time in Use)/(Time Available)
=(5 hr)/(7 hr)=.786 or 78.6%
Efficiency =(Actual Output)/(Standard Output)
=(20 shirts/day)/(25 shirts/day)=.80 or 80%
18) Product and Service Strategy (3pts)
n Type of operation is directly related to product and service strategy
n List the three basic strategies include
1)
2)
3)
19) When engineers develop a model, which step in the engineering process is taking place? (2pts)
A) Identify a problem or need
B) Design a solution or product
C) Implementing the design
D) Evaluating the solution or product
20) During which step of the design process do you test the solution or product? (2pts)
A) Identify a problem or need
B) Design a solution or product
C) Evaluate the solution or product
D) Implement the design
21) In which step of the design process would the engineer make adjustments to the design? (2pts)
A) Identify a problem or need
B) Design a solution or product
C) Implement the design
D) Evaluate the solution or product
22) If a design flaw is discovered, what is the next logical step for the design team? (2pts)
A) test the prototype again
B) scrap the project and start again
C) modify the design to solve the problem
D) obtain more money to support continued research
31) A company is planning to establish a chain of movie theaters. It estimates that each new theater will cost approximately $2 Million. The theaters will hold 500 people and will have 4 showings each day with average ticket prices at $12. They estimate that concession sales will average $6 per patron. The variable costs in labor and material are estimated to be $8 per patron. They will be open 300 days each year. What must average occupancy be to break-even?
n Break-Even Point
Total revenues = Total costs @ break-even point Q
Selling price*Q = Fixed cost + variable cost*Q
What is the gross profit if they sell 500,000 tickets
Profit = Total Revenue Total Costs

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!