Question: 1 Developing new production line requires a proper planning for proper manufacturing plant. ABC Company decided to increase its manufacturing plant by one extra
1 Developing new production line requires a proper planning for proper manufacturing plant. ABC Company decided to increase its manufacturing plant by one extra new manufacturing line to meet their customer demand. This new line includes 40 model types, and each model is expected to be 420 unity annually. This production line is made up of 185 components and all part are processed in one factory. To produce a single component, you require almost 4 processing steps that takes 180 seconds which includes setup time and part handling. The workstation requires 120 metre of flow space, and the factory operates one shift (2800 hr/yr). Determine: 1.1 Number of production operations each year, 1.2 Number of workers will be required in the plant and 1.3 How much floor space. (5) 2 Determine with explanation the plant's intended manufacturing capability, which refers to the technical and physical limitations of a manufacturing firm. (6) 3 Classify and define the four ways/processes that are used on part shaping which is the state of the starting material (8)
Step by Step Solution
3.36 Rating (152 Votes )
There are 3 Steps involved in it
Sure I can help you with that 11 The number of production operations each year can be calculated by multiplying the number of model types 40 by the ex... View full answer
Get step-by-step solutions from verified subject matter experts
