Question: 1) Elaborate a master production schedule (MRS) using material requirement planning (MRP) 1.1) Define the concept of MRP. What does it stand for? Why is
1) Elaborate a master production schedule (MRS) using material requirement planning (MRP)
1.1) Define the concept of MRP. What does it stand for? Why is it necessary to support production planning with and MRP?
1.2) Imagine that a production facility would not have implemented an MRP system: what would be the negative effects? Explain your concepts including suppliers, inventories and productivity.
1.3) What is BOM (Bill of Materials) Explain the concept and give examples. What is the relation with MRP?
2) Understand quality and efficiency control and how to measure
2.1) Quality begins with the design of a product in accordance with the customer specification further it involved the established Discuss why and give examples.
2.2) Why is it necessary Inspection in production? 100% inspection or sampling inspection. When do we use each and what are the reasons for it?
2.3) Why do we define tools for measuring and controlling quality. Give the list of basic tools in Quality Management, explain, and give examples.
2.4) What are the most usual wastes in a production system? How TPM can reduce or eliminate these wastes and improve the efficiency in a manufacturing process?
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
