Question: 1. Given below is a project information for a construction company with probabilistic activity duration estimates in weeks. Using PERT technique, analyze the project and

1. Given below is a project information for a construction company with probabilistic activity duration estimates in weeks. Using PERT technique, analyze the project and answer the questions below: (2*5 marks) Activity Predecessor Optimistic (a) Most Likely Pessimistic (m) 3 D BE 1. 5 2.5 1.5 17.5 3.5 2 H F.G.I a. The expected total time require to complete the project will be b. The variance in the project will be C. Total float for activity F will be d. The probability that the project will be completed in 20 weeks will be Total Quality Management Page 1 of 2 e. With a probability of 82%, the deadline in weeks) to meet the project will be 1. Given below is a project information for a construction company with probabilistic activity duration estimates in weeks. Using PERT technique, analyze the project and answer the questions below: (2*5 marks) Activity Predecessor Optimistic (a) Most Likely Pessimistic (m) 3 D BE 1. 5 2.5 1.5 17.5 3.5 2 H F.G.I a. The expected total time require to complete the project will be b. The variance in the project will be C. Total float for activity F will be d. The probability that the project will be completed in 20 weeks will be Total Quality Management Page 1 of 2 e. With a probability of 82%, the deadline in weeks) to meet the project will be
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock