Question: 1 . Given below is stream flow data due to a storm of two hour duration. The area of the drainage basin is 2 0

1. Given below is stream flow data due to a storm of two hour duration. The area of the drainage basin is 2000 Acre. Determine the total volume of direct runoff (in inch). Use the constant discharge method to separate the base flow. Plot the hydrograph (5 points).
2. Prepare a unit hydrograph for the two-hour duration storm for this watershed based on the storm given in question\# 1. Plot the UH (5 points).
3. Construct a Unit hydrograph for the Four-hour duration from the two-hour duration UH you generated above. Plot the 4- hour UH (5 points).
4. Based on NRCS triangular UH for a 360 acres of watershed with average slope of \(2\%\) and flow (channel) length of \(7114\mathrm{ft}\)., estimate the curve number \((\mathrm{CN})\) for a watershed. Peak discharge of UH is \(184\mathrm{ft}^{3}/\mathrm{s}\)(5 points).
1 . Given below is stream flow data due to a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!