Question: 1. How are lean systems different from traditional production systems? 2. What are the different types of waste (aka muda) that lean systems seek to
1. How are lean systems different from traditional production systems?
2. What are the different types of waste (aka muda) that lean systems seek to eliminate?
3. What is achieved by performing value stream mapping? Why perform takt time calculations and how is takt time calculated?
4. What do these terms mean?
- JIT (just in time)
- value-added
- 5S (Sort-Straighten-Scrub-Systemize-Standardize)
- visual factory
- kaizen
- poka yoke
- kanban
- Design for Manufacturability (DFM)
5. What are the key principles of the theory of constraints (TOC), per the text book?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
