Question: 1- IF the (Most Optimistic time (least time) t0, Most likely time tm, Most Pessimistic (Greatest time) tp ) are shown in the network bellow.

 1- IF the (Most Optimistic time (least time) t0, Most likely

1- IF the (Most Optimistic time (least time) t0, Most likely time tm, Most Pessimistic (Greatest time) tp ) are shown in the network bellow. Calculate the variance and the expected time for each activity