Question: 1) In a CONTROL chart, the upper control limit is how many estimated standard deviations above the average or mean? Group of answer choices a)50
1) In a CONTROL chart, the upper control limit is how many estimated standard deviations above the average or mean?
Group of answer choices
a)50
b)4
c)3
d)6
2) For 127 consecutive days, a process engineer has measured the temperature of champagne bottles as they are made ready for serving. Each day, she took a sample of 7 bottles. The average across all 889 bottles (127 days, 7 bottles per day) was 50 degrees Fahrenheit. The standard deviation across all bottles was 1.5 degree Fahrenheit. When constructing a basic chart, the center line is _____ degrees Fahrenheit.
Group of answer choices
60
40
39
50
3) Which of the following elements is not part of a control chart?
Group of answer choices
The control limits, LCL and UCL
The long-run center line
The specification limits, LSL and USL
values from each sample
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts