Question: 1. In scheduling resource-constrained projects, _________ are typically used rather than optimum mathematical solutions. 2. When using the _______ scheduling technique, startup and shutdown costs
1. In scheduling resource-constrained projects, _________ are typically used rather than optimum mathematical solutions.
2. When using the _______ scheduling technique, startup and shutdown costs are major considerations.