Question: 1 ) in the lectures and in the exercises, numerical material flow simulations have been shown and done by students. The WIP level was varied
in the lectures and in the exercises, numerical material flow simulations have been shown and done by students.
The WIP level was varied in a series of simulations to determine its effect on an important production parameter.
Which parameter is it
Please draw the chart that was created from the simulation results WIP level on the xaxis
What does WIP mean?
In how far is it an important production parameteI?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
