Question: 1. Loan Processing times are being monitored at a local company. Samples of six observations each have been taken, and the results are listed. Using
1. Loan Processing times are being monitored at a local company. Samples of six observations each have been taken, and the results are listed. Using Factors from Table 10.3, determine lower and upper control limits for a a mean chart
Sample Number 1 2 3 4 5
------------- 65 65 66 58 55
------------- 68 58 62 73 67
------------- 58 51 63 54 58
------------- 45 65 51 61 73
------------- 55 67 64 76 64
------------- 59 51 63 65 57
a) 39.425, 83.041
b) 51.269, 71.197
c) 50.329, 72.137
d) 52.209, 70.257
e) none of these
2. Loan Processing times are being monitored at a local company. Samples of ten observations each have been taken, and the results are listed. Using Factors from Table 10.2, determine lower and upper control limits for a a Range chart
Sample Number 1 2 3
------------- 93 71 74
------------- 96 89 76
------------- 85 79 83
------------- 86 65 76
------------- 71 73 66
------------- 61 70 68
------------- 79 81 83
------------- 95 88 81
------------- 72 77 91
------------- 75 75 76
a) 60.389, 96.601
b) 3.08, 60.9
c) 0, 71.96
d) 6.16, 49.84
e) none of the above