Question: 1. Question 1 Any robust control system will have built in measures designed to sustain itself with the commitment of operators, quality personnel, and management.
1.
Question 1
Any robust control system will have built in measures designed to sustain itself with the commitment of operators, quality personnel, and management.
Status: [object Object]
1 point
False
True
2.
Question 2
A _____________is a document describing the critical to quality characteristics of a process
Status: [object Object]
1 point
FMEA
Control plan
Procedure
Work instruction
3.
Question 3
Response plans document next steps once an issue has been detected and judgement rendered. These plans include the actions to be taken within a certain time frame and who will be responsible for execution.
Status: [object Object]
1 point
False
True
4.
Question 4
A gage control plan focuses specifically on the instruments used to monitor and assess the proper function of the process. It is meant to be a substitute for actual calibration.
Status: [object Object]
1 point
True
False
5.
Question 5
In pre-control, if the first part is in the yellow zone and the second part is in the yellow zone on the opposite side , we should
Status: [object Object]
1 point
Stop
Run
Adjust
Punt
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
