Question: 1. Solve the following Linear Programing Model using Excel Solver The Luzon Timber Corporation cuts raw timber, lauan, and tanguile, into standard size planks. Two

1. Solve the following Linear Programing Model
1. Solve the following Linear Programing Model using Excel Solver The Luzon Timber Corporation cuts raw timber, lauan, and tanguile, into standard size planks. Two steps are required to make these planks from raw timber: debarking and cutting. Each hundred feet of lauan takes 1 hour to debark and 1.2 hours to cut. Each hundred feet of tanguile takes 1.5 hours to debark and 0.6 hours to cut. The bark removing machines can operate up to 600 hours per week but the cutting machines are limited to 480 hours per week. Luzon Timber can buy a maximum of 36,000 feet of raw lauan and 32,000 feet of raw tanguile. If the prot per hundred feet of processed logs is P180 for lauan and P200 for tanguile, how much lauan and tanguile should be bought and processed by the corporation to maximize total prots? Formulate this problem as a linear programming model

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!