Question: 1. The Activity-Based costs assigned to cost objects are based on what? a. The size of the cost object. b. Actual levels of capacity usage.
1. The Activity-Based costs assigned to cost objects are based on what?
a. The size of the cost object.
b. Actual levels of capacity usage.
. Activity cost pools.
d. Planned levels of spending and capacity usage.
e. Actual levels of spending.