Question: 1. This problem studies fixed-priority scheduling. Consider two tasks to be executed periodically on a single processor, where task 1 has period p = 4
1. This problem studies fixed-priority scheduling. Consider two tasks to be executed periodically on a single processor, where task 1 has period p = 4 and task 2 has period p2 = 6. (a) Let the execution time of task 1 be ej = 1. Find the maximum value for the execution time e of task 2 such that the RM schedule is feasible. (b) Again let the execution time of task 1 be ej = 1. Let non-RMS be a fixed- priority schedule that is not an RM schedule. Find the maximum value for the execution time e2 of task 2 such that non-RMS is feasible. (c) For both your solutions to (a) and (b) above, find the processor utilization. Which is better? that yield 100% utiliza
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts