Question: 1. What are you going to make? (6 points) (Note: The maximum build size is 25 cm by 16 cm by 15 cm about the

 1. What are you going to make? (6 points) (Note: The

maximum build size is 25 cm by 16 cm by 15 cm

1. What are you going to make? (6 points) (Note: The maximum build size is 25 cm by 16 cm by 15 cm about the size of a small shoe box.) I'm going to create a rubix cube (5.7 x 5.7 x 5.7) Operations (33 points total) How much is it going to cost to make your object? Use the questions below to determine you r initial investment and how much it will cost to produce each item. 2. For each expense category - complexity, design, and quality - decide whether your produ ct has high, medium, or low requirements. In the table below, fill in the three boxes that apply to your project with the operational costs associated with those expenses. ( 6 points: 2 point 3 for each box) Expense $400 $1200 annlnvitu 2D nrinfnr

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Economics Questions!