Question: 1) What is the difference between avoiding a risk and retaining a risk? 2) How are the work breakdown structure and change control connected? 3)
1) What is the difference between avoiding a risk and retaining a risk?
2) How are the work breakdown structure and change control connected?
3) What is the difference between risk mitigation and contingency planning?
*Choose ONE of these questions to
respond to.
*Your post should be a minimum of 100
words.