Question: 1. Which operation is the bottleneck? 2.The bottleneck time = _______ minutes per unit. 3. For the entire production system, the throughput time = _______

1. Which operation is the bottleneck?
2.The bottleneck time = _______ minutes per unit.
3. For the entire production system, the throughput time = _______ minutes.
4. If the company operates 2 shifts per day, 7.5 hours per shift, & 6 days per week, the weekly capacity of this production system = _______ units.
A production system at Lakeview Manufacturing is given in the flowchart below. The bending operation occurs separately from, and simultaneously with, cutting and drilling, which are independent and sequential operations. A product needs to go through only one of the three parallel assembly operations. The product then proceeds to the last workstation for testing. Assembly 2 units/hour Cutting 12 units/hour Drilling 15 units/hour Welding 7.5 units/hour Assembly 2 units/hour Testing 20 units/hour Bending 10 units/hour Assembly 2 units/hour
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
