10 8.33 points Source Demand 1 2 3 4 1 1.08 M M M 10 2 1.09 1.11 M M 25 Check my work mode: This shows what is correct or incorrect for the work you have complet: Destination 3 1.11 1.13 11 M 35 4 1.13 114 1.11 1.13 30 5 0 0 0 0 40 Supply 35 45 40 20 Interactively apply the transportation simplex method to solve the Airplane Co. production scheduling problem as it is formulated in the given table, where the cost is in million dollars. Cost incurred=$ 93