Question: (10 points) A contractor has four cranes and three construction sites. Each construction site requires one crane. The costs (in $1,000) of moving the cranes

(10 points) A contractor has four cranes and

(10 points) A contractor has four cranes and three construction sites. Each construction site requires one crane. The costs (in $1,000) of moving the cranes to each site are shown below. The contractor wants to assign the cranes to the three construction sites to minimize the total moving cost. Use the Hungarian method to determine the best assignment(s) and the corresponding minimum total moving cost. (Show all the possible assignments if there are ties) Site A Site B Site C 3 5 Crane #2 5 7 8 7 59 6 8 9 AN