11. (Conceptual Cost Estimate) Use the conceptual cost estimate method to estimate the total cost of...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
11. (Conceptual Cost Estimate) Use the conceptual cost estimate method to estimate the total cost of a 2,200 SF project to be built at Oklahoma City in 2028. The following projects are constructed in 2018 at Las Vegas. (130 Points) Project 1 2 3 45 Total Cost $147,300 $153,700 $128,100 $118,400 $135,700 Size (SF) 2,580 2,900 2,100 1,850 2,300 RS Means Cost Index Year 2019 2022 Index 223 297 Location Index Location Houston Oklahoma City Las Vegas Index 87 84 110 6 (RS Means Detailed Estimate) The following data is provided from the RS means cost guide to estimate the cost of an asphaltic concrete paving in parking lots. The asphalt pavement is made of 6 inches stone base course, 2 inches binder course, and I inch asphalt concrete. Calculate the labor hours (man hours) required per square feet (SF) pavement and the total cost to pave 150,000 SF of parking lots. Add 15% for overhead and profit in the estimate. (200 Points) CSI activity code: 32.12.16.14.00.20 Flexible Paving Daily production rate (output) = 9,000 SF/day (based on 8 hrs of work per day) Equipment 1 Asphalt Paver = $3,500 per day 1 Tandem Roller (10 tons) = $550 per day The crew involved for this activity is 1 labor foreman @ $65.00/hr 3 laborers @ $55 per hour each 1 paver operator @ $75.00/hr 1 roller operator @ $70.00/ day 11. (Conceptual Cost Estimate) Use the conceptual cost estimate method to estimate the total cost of a 2,200 SF project to be built at Oklahoma City in 2028. The following projects are constructed in 2018 at Las Vegas. (130 Points) Project 1 2 3 45 Total Cost $147,300 $153,700 $128,100 $118,400 $135,700 Size (SF) 2,580 2,900 2,100 1,850 2,300 RS Means Cost Index Year 2019 2022 Index 223 297 Location Index Location Houston Oklahoma City Las Vegas Index 87 84 110 6 (RS Means Detailed Estimate) The following data is provided from the RS means cost guide to estimate the cost of an asphaltic concrete paving in parking lots. The asphalt pavement is made of 6 inches stone base course, 2 inches binder course, and I inch asphalt concrete. Calculate the labor hours (man hours) required per square feet (SF) pavement and the total cost to pave 150,000 SF of parking lots. Add 15% for overhead and profit in the estimate. (200 Points) CSI activity code: 32.12.16.14.00.20 Flexible Paving Daily production rate (output) = 9,000 SF/day (based on 8 hrs of work per day) Equipment 1 Asphalt Paver = $3,500 per day 1 Tandem Roller (10 tons) = $550 per day The crew involved for this activity is 1 labor foreman @ $65.00/hr 3 laborers @ $55 per hour each 1 paver operator @ $75.00/hr 1 roller operator @ $70.00/ day
Expert Answer:
Answer rating: 100% (QA)
To estimate the total cost of the 2200 SF project in Oklahoma City in 2028 using the conceptual cost estimate method we can use the RS Means Cost Index and Location Index to adjust the costs of the si... View the full answer
Related Book For
The Economics Of The Environment
ISBN: 9780321321664
1st Edition
Authors: Peter Berck, Gloria Helfand
Posted Date:
Students also viewed these finance questions
-
The following gives information on visitors to Jellybear Park: A researcher keeps careful track of visitors to Jellybear and learns that there is a total of 3750 visits to the park in one year. The...
-
Managing Scope Changes Case Study Scope changes on a project can occur regardless of how well the project is planned or executed. Scope changes can be the result of something that was omitted during...
-
Use the attached "words.txt" file to store the words along with their ranks in an AVL tree. Then provide the user the option to search for any word. If the word exists the program displays the rank...
-
Plot the six risks on a probability/impact matrix using the project impact matrix 2023 template. Write one to two sentences stating the rationale for how you determined the quadrant placement for...
-
Gators, Inc., is considering a project that requires an initial investment of $2,000,000 and that will generate the following cash inflows for the next five years: Year Cash Inflow at End of Year 1...
-
Explain the concept of a pool rate in activity-based costing. Exhibit 5-6 ABC Data and Calculations for the Machine-Related Cost Pool: Dronze Inc. Microsoft Excel DRONZE ABC CALCULATIONS 1. Compute...
-
Five projects form the mutually exclusive, collectively exhaustive set under consideration. The cash flow profiles for the five projects are given in the table below. Information on each project was...
-
The Southwick Company has the following balance sheet ($000): Financial Ratios Current ratio ........ 1.92 Quick ratio ....... 1.08 Debt-to-equity ratio ...... 0.79 Evaluate the impact of each of the...
-
Suppose the consumer has a wage of $52.00 per week to spend on Goods A, B & C. The cost per unit of each of these goods is Good A: $1.00 per unit, Good B: $2.00 per unit, Good C: $4.00 per unit. Use...
-
What are the implications of the statement made by the head of operations that Today, apparel is produced just about everywhere on Earth, and we have basically run out of new low cost places to...
-
Using Mckinseys7S framework, discuss how a company like SHELL evaluates its selection of markets while going overseas. Note: Student can use also other company doing overseas business. Whether SHELL...
-
Soho Inc. is considering an investment that has an expected return of 22.5% and a standard deviation of 8%. What is the investment's coefficient of variation?
-
A stock had returns of 16.27 percent, 24.18 percent, ?12.29 percent, and 9.62 percent over four of the past five years. The arithmetic average return over the five years was 13.28 percent. What was...
-
Evaluate f(-10), (1), f(10) for the following picewise function f(t). Find domain,range and sketch the graph of the given function: f(t)= = t-4, t>4 8-2t, t < 4.
-
You invested $100,000 into an account 25 years ago. The investment is now worth $350,000. Calculate the interest rate if the investment was compounded semi-annually.
-
Glenview Hospital currently has six surgical suites including two Da Vinci robots. The director of surgery is proposing a capital investment in an additional robot. The director has gathered data to...
-
A golf ball falling in air experiences a drag force p/u/ 2 Fa = CdA where A is the cross section of the ball, p the density of air, ca~ 0.5 is the drag coefficient, u the velocity of the golf ball,...
-
An interest bearing promissory note for 90 days at 5.6% p.a. has a face value of $120,000. If the note is discounted 20 days after the issue date at a rate of 6.8% p.a., calculate the amount of...
-
Efficiency over time involves maximizing the present value of net benefits. What is the relationship between sustainability and efficiency? Is an efficient society likely to be sustainable? If so,...
-
(a) Why might there be a negative relationship between gross domestic product (GDP) and environmental quality for a country? Why might there be a positive relationship between GDP and environmental...
-
This chapter explained one of the two main ways that money was transferred to farmers. Another method was called a target price-deficiency payment program. Let's use textbook Figure 2.12 to examine...
-
A Pepsi promotion encouraged consumers to collect Pepsi points and redeem them for merchandise. If they did not have quite enough points for the prize they wanted, they could buy additional points...
-
John and Jennifer Margeson entered into a contract to sell a weight-loss franchise business called Inches-A-Weigh to Theresa Artis. The parties memorialized their agreement in an Asset Purchase...
-
What is the mirror-image rule?
Study smarter with the SolutionInn App