Question: 12- The table below represents the data associated with an assembly line. (8 points) a) Calculate availability (A)? b) Calculate performance (P)? c) Calculate Quality

12- The table below represents the data12- The table below represents the data

12- The table below represents the data associated with an assembly line. (8 points) a) Calculate availability (A)? b) Calculate performance (P)? c) Calculate Quality (Q)? d) Calculate OEE? Item Shift length (only one shift per day) Breaks Downtime (machine breakdown) Ideal cycle time Total count Reject count Data 8 hours (480 minutes) (2) 10 minutes, and (1) 20 minutes 44 minutes 1.2 seconds 18,976 418