Question: 14. Production Scheduling. A simple model is sometimes used in order to illustrate the production-scheduling maxim, bal-ance flow, not capacity. Consider a factory that consists
14. Production Scheduling. A simple model is sometimes used in order to illustrate the production-scheduling maxim, "bal-ance flow, not capacity." Consider a factory that consists of three workstations where each customer order must proceed through the workstations in sequence. Next, suppose that the workloads are balanced, which means that, on average, each order requires equal amounts of work at each of the three stations. Assume that the average operation time is 60 minutes