Question: 15.3 Quality assurance and control involves: Statistical sampling of carefully chosen activities Lowering standards to a more realistic level Inserting contingencies in many activities to
-
15.3 Quality assurance and control involves:
Statistical sampling of carefully chosen activities
Lowering standards to a more realistic level
Inserting contingencies in many activities to alleviate mistakes
A large increase of inspection personnel
10 points
QUESTION 2
-
15.5 Which type of chart shows both the causes of nonproductive time and the cumulative percentage of all causes?
Control chart
Histogram
Pareto diagram
Trending diagram
10 points
QUESTION 3
-
15.4 Which of the following typically gets best results when planning for quality control:
Plan , execute, inspect, and report results
The scope, cost estimating, and scheduling are all analyzed and intergrated
Tolerance limits must be compared to specification limits
The architect, owner, and construction manager must all agree on the plan
10 points
QUESTION 4
-
15.2 Quality control lowers overall project costs for all reasons except:
Conformance aactivities focus on management functions preformed by a few people quickly and efficiently
Remediating non conformance requires some management time and usually involves construction labor,materials,and equipment
Non conformance can add additional costs such as legal liability and damage reputation
Over time, quality control becomes part of the management culture and so becomes cost free
None of the above
10 points
QUESTION 5
-
15.1 Which of the following best describes quality control?
High- grade materials were specified
The project was expensive but worth it
Intended results were reliably achieved
State-of-the-art materials were used throughout