Question: 18? An inverse method of leveling is executed between two existing concrete structures and across a concrete wall located midway between the two structures. All

18? An inverse method of leveling is executed
18? An inverse method of leveling is executed between two existing concrete structures and across a concrete wall located midway between the two structures. All rod readings, as indicated in the accompanying sketch, were taken with the rod held upside down. Cone Wall - A Bottom Line of Bottom Line of Concrete Beam Concrete Beam (Elev - 240.05 m) [Elev Unknown) Leveling Leveling Rod Rod Leveling Rod 2.05 m 2.87 m 2.75 m 2.30 m (BS] [FS) (BS) [FS] L-2 L-1 From the data portrayed if the elevation of A (bottom of the concrete beam of the first structure) is 240.05 m, the elevation of the bottom of the concrete beam of the second structure (indicated as C) should be a) 234.68 m d) 238.78 m b) 240.42 m e) 242.40 m c) 239.68 m Solution

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!