Question: 1.Developa C# Program that Checks Whether the Entered Year is a Leap Year or Not. 2.The after information is accessible for the monetary examination of
1.Developa C# Program that Checks Whether the Entered Year is a Leap Year or Not.
2.The after information is accessible for the monetary examination of substitute recommendations for a similar venture. Lead a monetary assessment and figure out which of the two ought to be picked for execution?
Absolute yearly expressway cost of existing interstate = 1,16,940
Complete yearly street client cost of existing roadway = 13,82,870
Complete yearly roadway cost of proposition A = 2,65,422
Complete yearly street client cost of proposition A = 10,22,465
Complete yearly interstate expense of proposition B = 3,30,300
All out yearly street client cost of proposition B = 10,53,224
3.The yield of a laser has heartbeat term of 30 ms and normal yield force of 1 W for each heartbeat. What amount of energy is delivered per beat if frequency is 6600 ?
4.What will be the basic mix of stresses at the corner if the accompanying anxieties have been determined for the asphalt?
Burden pressure = 30.50 kg/cm2
Distorting pressure = 8.56 kg/cm2
Frictional pressure = 0.77 kg/cm2
5.What will be the basic mix of stresses at the edge during winter if the accompanying anxieties have been determined for the asphalt?
Burden pressure = 35.67 kg/cm2
Twisting pressure = 30.31 kg/cm2
Frictional pressure = 0.89 kg/cm2
6.A cc piece of thickness 25 cm is built over a base of granular material with a modulus of response 8 kg/cm3. The most extreme temperature differential between the top and lower part of the piece is discovered to be 20C during summer day and night. The separating between cross over joints is 4.5 m and the dividing between longitudinal joints is 3.5 m. The plan wheel load is 5100 kg, range of contact territory is 15 cm, Poisson's proportion is 0.13, modulus of versatility is 2105 kg/cm2, the warm coefficient is 10 10-6/C and the coefficient of rubbing is 1.5. Utilizing the above data, track down the most exceedingly awful mix of stresses during mid-night.
7.What gives the hypothetical degree for greatest thickness?
8.Which equation gives the measure of concrete needed for soil adjustment if different boundaries are given?
9.What is the greatest misfortune in the dirt concrete blend after 12 patterns of freeze/defrost test for soil type a-7?
10.The plan concrete substance is taken as that concrete substance relating to a strength of ______
11.By which rate can the thickness of the granular base course be diminished if soil-concrete is utilized, according to the Highway Research Board?
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
