Question: 1)What is the forecast for week 16 using exponential smoothing with = 0.1? Assume that the forecast for week 1 was 62. 2)What is the

1)What is the forecast for week 16 using exponential smoothing with = 0.1?
Assume that the forecast for week 1 was 62.
2)What is the forecast for week 16 using exponential smoothing with = 0.8?
Assume that the forecast for week 1 was 62.
3)What is the mean square error for the forecast with = 0.1 as of week 15? Do not use week one in your calculations.
4)What is the mean square error for the forecast with = 0.8 as of week 15? Do not use week one in your calculations.
5)What is the period 15 tracking signal for the forecast with = 0.1?
6)What is the period 15 tracking signal for the forecast with = 0.8?
The number of flowers sold at The Blossom Shop on Fridays is shown in the table below. Week Demand Week Demand Week Demand 6 8011 88 12 89 5 72 10 60 15 64 Round off all calculations to two decimal places. Maintaining two decimal places is required for all calculationsStep by Step Solution