Question: 2 0 4 CHAPTER 9 Dewatering PROBLEMS Figure 9 . 2 1 is representative of soil conditions at a construction site. If you are the

204
CHAPTER 9
Dewatering
PROBLEMS
Figure 9.21 is representative of soil conditions at a construction site. If you are the contractor, select a dewatering method you would consider appropriate for each of the projects described below. Consider the information given in this chapter, earlier chapters and any other information that may be appropriate. Describe in detail how your system would be built and operated. Justify clearly any assumptions you make. Discuss what difficulties you may encounter and how you should plan for them.
a. A circular reservoir 100ft in diameter is to be built with a bottom slab 25ft below present ground surface. The groundwater level must be held at least 2ft below the slab until the reservoir is filled.
b. A bridge pier with a driven pile foundation is to be built with the bottom of the pile cap 40ft below present grade. The cap is 20ft by 30ft in plan view.
FiguRE 9.21 Soil Profile for Problem 1.
Soil description
2 0 4 CHAPTER 9 Dewatering PROBLEMS Figure 9 . 2

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!