Question: 2 0 . Consider a production process that produces tires. A quality engineer has taken 1 5 samples, each containing 2 0 0 tires. The

20. Consider a production process that produces tires. A quality engineer has taken 15 samples, each containing 200 tires. The total number of defective tires over the 15 samples is 340. The LCL for the control chart constructed using two sigma is Ans______
a)0.022.
b)0.036.
c)0.048.
d)0.066.