Question: ( 2 0 ' ) Consider P 4 | | prec | C m a x | with 1 2 jobs. table [ [
Consider prec with jobs.
tablejobs
The jobs are subject to the precedence constraints depicted below. PLEASE SPET BY STEP
a Apply the generalized version of the CP rule: every time a machine is freed select the job at the head of the string with the largest total amount of processing.
b Apply the generalized version of the LNS rule: every time a machine is freed select the job that precedes the largest total amount of processing.
c Is either one of these two schedules optimal?