Question: ( 2 0 , Mitchell Book Problem 3 . 1 ) An embankment of 1 5 m height is to be constructed on the soil

(20, Mitchell Book Problem 3.1) An embankment of 15 m height is to be constructed on the soil profile shown in Figure within a period of 18 months. Assume ?PI=30,Cv=110-7m2s-1 in the crustal zone and 110-6m2s-1 in the underlying clay, kh=2kv,St=8 for the foundation soil and =18kNm-3 for the embankment (top width 15 m and cot=2.(Note: St= undisturbed vane strength divided by remolded vane strength)
a. Consider the possibilities of constructing this embankment by stage construction with sand drains and with berms.
b. If compacted fill for berms cost $2.80 per m3 plus a cost of $200.00 per meter of embankment strike length for additional right of way, and sand drains cost $4.25 per meter of sand drain, recommend the most economical method of construction.
( 2 0 , Mitchell Book Problem 3 . 1 ) An

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!