Question: . ( 2 0 points ) A segment of 6 - lane freeway is under analysis. The segment is 2 miles long on an 4

.(20 points) A segment of 6-lane freeway is under analysis. The segment is 2 miles long on an4.5% grade with the eastbound being the uphill. Lane width is 11 ft with 4 ft shoulder on thenright side. There are 6 ramps in this segment. Peak hour volume is 4000 veh/h with 3% single-unit trucks and 7% tractor-trailers. Peak-hour factor is 0.92. State DOTs goal is to provide a level of service no less than D during the peak 15 minutes in peak hour. (1).Determine if this goal is achievable in the eastbound direction. (2). If yes, how much traffic can be added to the eastbound before level of service drops to the next level.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!