Question: ( 2 0 points ) : A worker is responsible for loading and unloading the CNC machine producing special bolts. Each cycle, 1 bolt is

(20 points): A worker is responsible for loading and unloading the CNC machine producing
special bolts. Each cycle, 1 bolt is produced, the load/unload elements have total normal time
of 24 seconds, and the machine time is 2.83 minutes. Every sixth cycle, the operator must do
quality parameter checks on the CNC, which takes 3 minutes and 15 seconds (normal time).
Company uses PFD allowance factor as 15% and the machine allowance factor as 10%.
1.(10 points) Determine the standard time for the process and the corresponding standard
daily production quantity for an 8-hour shift.
2.(10 points) Company found a way to internalize the irregular element (quality checking).
This means, in the 6th cycle, quality checking on the CNC can be done while the CNC is
working. Determine the standard time for the modified process and the corresponding
standard daily production quantity for an 8-hour shift.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!