Question: ( 2 0 pts ) The following are data from a completed leveling job on a road. Prepare a set of profile leveling notes for

(20pts) The following are data from a completed leveling job on a road. Prepare a set of profile leveling notes for the data using Collimation (Height of Instrument) method and show the page check. All data is given in feet. The elevation of BM A is 653.72, and the elevation of BM B is 674.22.
\table[[Station,BS,IS,FS,Elev],[BM A,5.98,,,653.72],[11+00,,5.4,,],[TP1,8.19,6.3,3.25,],[12+00,,5.5,,],[12+50,,5.9,,],[13+00,,6.1,,],[14+00,8.78,5.4,,],[TP2,,5.0,,],[14+73,,5.5,3.11,],[15+00,9.88,,3.05,],[16+00,,,,],[TP3,,,,],[BM B,,,,]]
( 2 0 pts ) The following are data from a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!