Question: 2 . 1 A certain mine intends to start a bord and pillar mining panel and thereafter perform pillar extraction on the same panel. On
A certain mine intends to start a bord and pillar mining panel and thereafter perform pillar extraction on the same panel. On surface there is a farmers water borehole. Design panel layout to ensure that the water table in the overburden is preserved. marks
Given: Bord width of m and pillar width of m Depth below surface m Thickness of dolerite sill m intersected at m Goaf angle kratio