Question: 2. [-/12.5 Points] DETAILS MY NOTES ASK YOUR TEACHER PRACTICE ANOTHER Photon Technologies, Inc., a manufacturer of batteries for mobile phones, signed a contract

2. [-/12.5 Points] DETAILS MY NOTES ASK YOUR TEACHER PRACTICE ANOTHER PhotonTechnologies, Inc., a manufacturer of batteries for mobile phones, signed a contract

2. [-/12.5 Points] DETAILS MY NOTES ASK YOUR TEACHER PRACTICE ANOTHER Photon Technologies, Inc., a manufacturer of batteries for mobile phones, signed a contract with a large electronics manufacturer to produce three models of lithium-ion battery packs for a new line of phones. The contract calls for the following. Battery Pack Production Quantity PT-100 202,000 PT-200 101,000 PT-300 149,000 Photon Technologies can manufacture the battery packs at manufacturing plants located in the Philippines and Mexico. The unit cost of the battery packs differs at the two plants because of differences in production equipment and wage rates. The unit costs for each battery pack at each manufacturing plant are as follows. Product Philippines Mexico PT-100 $0.95 $0.98 PT-200 $0.98 PT-300 $1.34 $1.06 $1.15 The PT-100 and PT-200 battery packs are produced using similar production equipment available at both plants. However, each plant has a limited capacity for the total number of PT-100 and PT-200 battery packs produced. The combined PT-100 and PT-200 production capacities are 175,000 units at the Philippines plant and 160,000 units at the Mexico plant. The PT-300 production capacities are 75,000 units at the Philippines plant and 100,000 units at the Mexico plant. The cost of shipping from the Philippines plant is $0.18 per unit, and the cost of shipping from the Mexico plant is $0.10 per unit. (a) Develop a linear program that Photon Technologies can use to determine how many units of each battery pack to produce at each plant to minimize the total production and shipping cost (in dollars) associated with the new contract. (Assume P = number of PT-100 battery packs produced at the Philippines plant, P = number of PT-200 battery packs produced at the Philippines plant, P3 = number of PT-300 battery packs produced at the Philippines plant, M = number of PT-100 battery packs produced at the Mexico plant, M = number of PT-200 battery packs produced at the Mexico plant, M3 = number of PT-300 battery packs produced at the Mexico plant.) Min

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!