Question: 2 2 - 1 . A semi - actuated signal is to be installed and timed for the location shown in Figure 2 2 .

22-1. A semi-actuated signal is to be installed and timed for the
location shown in Figure 22.8. Because of light side-street
demand, a short minimum green of 6.0 seconds is desired.
Point detectors will be used. For the conditions shown:
(a) How far from the STOP line should the side-street
detectors be located?
(b) Recommend a passage time.
(c) Compute yellow and all-red times.
(d) Recommend a maximum side-street green and a
minimum main street green.
(e) What is the critical cycle length?
(f) Are pedestrian signals and/or pushbuttons required
for crossing the main street? The side street?
2 2 - 1 . A semi - actuated signal is to be

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!