Question: 2 . 2 . A flat dipping deposit that is 4 0 0 m to 6 0 0 m deep is envisaged to be accessedby

2.2. A flat dipping deposit that is 400 m to 600 m deep is envisaged to be accessedby either a trackless decline at a slope of 8\deg , a rail-bound incline at 18\deg or a vertical shaft. Read the additional information in the table below and answer the following questions:Parameter Decline Incline Vertical shaftDimensions 5 m x 5 m 3 m x 3 m 8 m diameterDevelopment advance rates (m/day)5.43.73.6Development costs (R/m)1800002000001000000Hoisting costs (R/t)400030003600Rock hoisting capacity (t/day)1636.36412002182a. Which excavation will require the largest metres to be developed to access the entire orebody?b. Which excavation will require the largest tonnages to be developed toaccess the entire orebody? (Use an average bulk density of 4 t/m3)c. Based only on the information at hand, which alternative should be chosen?d. If the choice of the type of access development is based solely on how quickly the reef will be intersected, which excavation should be chosen

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!