Question: 2 . 2 Assignment A Small Project Cost Estimate A small business owner plans to contract their first warehouse construction. The design is done and

2.2 Assignment
A Small Project Cost Estimate
A small business owner plans to contract their first warehouse construction. The design is done and the blueprints are ready. The owner wants to obtain a construction estimate.
Instructions
Your assignment is to prepare the construction estimate proposal, which must include only the warehouse building, meaning the foundation, walls, doors, windows, and roof. Obtain the information from the provided drawing (download here) Download here)and the provided template. Download template.Note that using the Excel template will result in a better score since, in the real world, having experience with Excel improves your professional profile.
Professional skills such as using the appropriate material units and knowing how to calculate areas and volumes to provide quantities for material are a priority in this assignment.
Other Requirements:
Verify the criteria used to assess your assignment in order to learn how to obtain the maximum points on your assignment. Assignments are assessed either by a provided rubric or by point distribution.
This assignment/task is due on the date established by the instructor in the course calendar.
Submit your assignment/task through the learning platform.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!