Question: 2 4 . 0 6 . 2 0 2 2 A levelling network was set up around an area proposed for the construction of a

24.06.2022
A levelling network was set up around an area proposed for the construction of a building. The network is as shown. Use Least squares to compute the elevations of x,Y and Z . Compute the residuals of the level lines and the corrected observations. USE MATRICES.
(30 marks)
3
00M
100.00M
\table[[,N(m),E(m),Line,Difference in elevation (m)],[A,1411.574,7991.972,1,+1.02],[B,3841.645,9168.215,2,-0.95],[X,2445.070,10808.333,3,+1.96],[Y,2671.188,7087.379,4,-1.99],[Z,3700.826,8178.180,5,-0.04],[,,,6,+0.05]]