Question: 2 5 1 0 8 0 0 : 3 9 : 2 5 A time study was conducted on a task that consists of four
::
A time study was conducted on a task that consists of four elements. The observations and performance ratings for six cycles are shown in the following table.
tableObservations minutes per cycleElementPerformance Rating,
a Calculate the average time for each element. Round the final answers to decimal places.
References
b Calculate the normal time for each element. Round the final answers to decimal places.
tableElementPerformance Rating,NTminutesminutesminutesminutes
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
