Question: 2. (50) For the following data set, an engineer tells you that the correct value of is 97.3. a. (10) Is she correct? Verify by

2. (50) For the following data set, an engineer

2. (50) For the following data set, an engineer tells you that the correct value of is 97.3. a. (10) Is she correct? Verify by computing the value b. ABET OBJ #2: _(10) Which control charts would you recommend using? Explain selection C. (30) Evaluate if the process is in control. Do not recompute limits. You do not need to draw charts Sample 1 2 3 n 25 25 25 25 5 5 Xbar 104 101 93 95 93 97 Range 3 2 4 5 6 400 Stdev 0.7 0.2 0.59 0.36 0.14 14 4 5 6